issu run switchover

Use issu run switchover to perform an ISSU switchover.

Syntax

issu run switchover

Views

User view

Predefined user roles

network-admin

mdc-admin

Usage guidelines

Perform an ISSU switchover to upgrade the master after you execute the issu load command to upgrade the subordinate device.

The issu load command separates the upgraded subordinate device from the existing IRF fabric to form a new IRF fabric. When you execute the issu run switchover command, the master in the old IRF fabric reboots to join the new IRF fabric as a subordinate member.

Before you execute the issu run switchover command on the old master, make sure the new master has finished synchronizing its configuration and status data with the old master. To examine the synchronization progress, use the display device and display system internal ha service-group commands on the new IRF fabric. The synchronization is completed if the following conditions are met:

Examples

# Perform an ISSU switchover.

<Sysname> issu run switchover
Upgrade summary according to following table:

flash:/BOOT-R0202.bin
  Running Version             New Version
  Release 0201                Release 0202

flash:/SYSTEM-R0202.bin
  Running Version             New Version
  Release 0201                Release 0202

  Chassis   Slot              Switchover Way
  2         10                Global active standby MPU switchover
Upgrading software images to compatible versions. Continue? [Y/N]:y

Table 26: Command output

Field

Description

Switchover Way

Switchover method:

  • Active standby process switchover—Active/standby switchover between processes.

  • Global active standby MPU switchover—Active/standby switchover between MPUs.

For more information about the command output, see Table 22.

Related commands

issu load