Attaching the mounting brackets to the switch

The HPE 1950 12XGT 4SFP+, HPE 1950 24G 2SFP+ 2XGT, and HPE 1950 48G 2SFP+ 2XGT switches provide one front mounting position (near the network ports) and one rear mounting position (near the power supplies).

The HPE 1950 24G 2SFP+ 2XGT PoE+(370W) and HPE 1950 48G 2SFP+ 2XGT PoE+(370W) switches provide one front mounting position (near the network ports), one mid-mounting position, and one rear mounting position (near the power supplies).

To attach the mounting brackets to the switch:

  1. Determine the mounting position.

  2. Align one mounting bracket with the screw holes at the mounting position. Use M4 screws provided with the switch to attach the mounting bracket to the chassis.

  3. Repeat step 2 to attach the other mounting bracket to the chassis.

Figure 4: Attaching a two-hole mounting bracket to the front mounting position on an HPE 1950 24G 2SFP+ 2XGT switch

Figure 5: Attaching a two-hole mounting bracket to the rear mounting position on an HPE 1950 24G 2SFP+ 2XGT switch

Figure 6: Attaching a four-hole mounting bracket to the front mounting position on an HPE 1950 24G 2SFP+ 2XGT PoE+(370W) switch

Figure 7: Attaching a four-hole mounting bracket to the rear mounting position on an HPE 1950 24G 2SFP+ 2XGT PoE+(370W) switch

Figure 8: Attaching a four-hole mounting bracket to the mid-mounting position on an HPE 1950 24G 2SFP+ 2XGT PoE+(370W) switch