Remote Copy 3DC PP switchover operation
A three data center Peer Persistence (3DC PP) switchover operation reverses the role of the synchronous systems in a 3DC PP group. The switchover operation detects the 3DC PP configuration and states the secondary system is the one connected with a synchronous target. Therefore, the secondary system is selected automatically for the operation.
Changes the Remote Copy 3DC PP group Target role of the target systems. The primary system becomes secondary and the secondary system becomes the primary system.
Changes the replication direction.
Provides the host with read/write access to the volumes on the secondary system.