Hardware initialization and configuration

The hardware components of the Core Telco Blueprint are installed and configured in the following order:

  1. Complete the physical cabling of the various components using the Port map.

  2. Manually configure the FlexFabric 5900 switch (Management switch).

  3. Manually configure the Storefabric SN2100M switches (Data switches).

  4. Optional: Assign the iLO IP addresses to the DL servers. For the complete procedure, see Assigning static iLO-OOBM IP address to DL servers.