Hardware initialization and configuration
The hardware components of the Core Telco Blueprint are installed and configured in the following order:
Complete the physical cabling of the various components using the Port map.
Manually configure the FlexFabric 5900 switch (Management switch).
Manually configure the Storefabric SN2100M switches (Data switches).
Optional: Assign the iLO IP addresses to the DL servers. For the complete procedure, see Assigning static iLO-OOBM IP address to DL servers.