Configuration procedure

To schedule an NQA test group:

Step

Command

Remarks

1. Enter system view.

system-view

N/A

2. Configure a schedule for an NQA test group.

nqa schedule admin-name operation-tag start-time { hh:mm:ss [ yyyy/mm/dd ] | now } lifetime { lifetime | forever }

now specifies the test group starts testing immediately.

forever specifies that the tests do not stop unless you use the undo nqa schedule command.

3. Configure the maximum number of tests that the NQA client can simultaneously perform.

nqa agent max-concurrent number

Optional.

By default, the maximum number of tests that the NQA client can simultaneously perform is 2.