Configuration procedure
To schedule an NQA test group:
Step | Command | Remarks |
---|---|---|
1. Enter system view. | system-view | N/A |
2. Configure a schedule for an NQA test group. | nqa schedule admin-name operation-tag start-time { hh:mm:ss [ yyyy/mm/dd ] | now } lifetime { lifetime | forever } | now specifies the test group starts testing immediately. forever specifies that the tests do not stop unless you use the undo nqa schedule command. |
3. Configure the maximum number of tests that the NQA client can simultaneously perform. | nqa agent max-concurrent number | Optional. By default, the maximum number of tests that the NQA client can simultaneously perform is 2. |